Recent Projects2022-02-28T00:48:42+00:00
2702, 2022

Pool and concrete deck demolition in Saratoga

Project included remove of an existing pool, concrete deck, roof, Sheetrock, stucco exterior, all electrical wiring, HVAC duct-work and plumbing lines. All of the windows, doors, appliances, fireplaces and light fixtures were donated to a non-profit for re-use. We also filled and compacted the pool. This demo required extreme care to ensure the materials were re-usable.

206, 2018

Partial Home Demo in Menlo Park

Demo of a kitchen/dining/living/office/hall bathroom snd two bedrooms in Menlo Park. Demo of front and rear concrete porch and patio with jackhammers and compressor.

405, 2018

Partial Home Demo in San Jose

Partial Demo of a house on Aragon way in San Jose, CA. We gutted a kitchen/living room and dining room with some siding, stucco around windows, awning in backyard  and flooring throughout house.

405, 2018

Partial Home Demo in San Jose

Partial Demo of a house on Aragon way in San Jose, CA. We gutted a kitchen/living room and dining room with some siding, stucco around windows, awning in backyard  and flooring throughout house.

105, 2018

Mall Demolition in Pleasanton, CA

27,500 SQFT Demolition of 2 floors at Stoneridge Mall, Pleasanton, CA. Which included 9 stores/mall service corridors and demising walls. We used our Ride on floor scraper/scissor lifts and 30yd Trucks to complete the job on schedule. This Demolition was approximately 8 weeks long.

Go to Top